Hams Hall Power Station Birmingham

 

McDermott Construction / McFour were involved with Alfred McAlpine from 1996-1999 on more than 6 separate infrastructure contracts.  Turning the redundant Hams Hall Power Station into a thriving new business park and rail link for National Power.  Drainage works ranged from depths of less than 1 meter to over 8 meters, with pipe work ranging from 100mm up to 2m diameter.  It also included the construction of outfall interceptors and deep, large diameter man holes and shafts.

BT duct boxes which were prefabricated on site, being lifted into place.

BT duct boxes which were prefabricated on site, being lifted into place.

Drainage for one of the new link roads, under construction.

Drainage for one of the new link roads, under construction.

Large diameter pipe drainage construction

Large diameter pipe drainage construction

Road drainage with trench boxes

Road drainage with trench boxes

 

Runway 2 Manchester Airport ] Manchester United ] M60 Manchester ] Greyhound Stadium /Retail Park Chester ] [ Hams Hall Power Station Birmingham ] National Exhibition Centre ] Old Liverpool Airport ] Ogsten Water Treatment Works ] Birches Head Combined Sewer/Storage Stoke-on-Trent ]

About the Company ] Contact Information ] Location ] Services ] Contracts ]

Send mail to Webmaster with questions or comments about this web site.
Copyright © 2000 McDermotts Construction / McFour Ltd
All rights reserved Delia McDermott
Last modified: June 09, 2005