Birches Head Combined Sewer/Storage Stoke-on-Trent

 

During 2000 McFour Ltd were contracted by AMCO Construction to construct twin box culvert lines, large diameter elliptical pipes, and gravity pipelines to work in conjunction with their tunneling works for Stoke City Council / Severn Trent water on the Birches Head scheme.  The works involved laying the elliptical pipelines through a combination of difficult and poor ground conditions.  The box culverts were laid at depths up to 9 meters, in close proximity to a main trunk road and railway.

Box culvert sections being unloaded Box Culvert sections weighing in excess of 7 tonnes being unloaded and distributed.  Box culvert sections being distributed
Box culvert sections being installed Installation of twin box culvert line. Box culvert sections being installed
Elliptical pipe work Elliptical pipe weighing over 9 tonnes each, were laid as an alternative to conventional pipe and box culvert. Elliptical pipe work

Runway 2 Manchester Airport ] Manchester United ] M60 Manchester ] Greyhound Stadium /Retail Park Chester ] Hams Hall Power Station Birmingham ] National Exhibition Centre ] Old Liverpool Airport ] Ogsten Water Treatment Works ] [ Birches Head Combined Sewer/Storage Stoke-on-Trent ]

About the Company ] Contact Information ] Location ] Services ] Contracts ]

Send mail to Webmaster with questions or comments about this web site.
Copyright © 2000 McDermotts Construction / McFour Ltd
All rights reserved Delia McDermott
Last modified: June 09, 2005