McFour Ltd was employed by Carillion/AMEC joint venture for deep, large diameter drainage outfalls, runway drainage, communication ducts, aircraft landing communication ducts/structures.  This was a fast track drainage contract completed ahead of schedule.

1200mm main outfall sewer along side of new runway

1200mm main outfall sewer along side of new runway, under construction.

1200mm pipe construction under existing high voltage cables.

1200mm pipe construction

Deep trench excavation

Deep trench excavation

French drains construction 

French drains construction

Manhole Construction

Manhole Construction

Storm water outfall drainage construction. 

750mm sewer pipe.

Storm water outfall drainage construction

 

[ Runway 2 Manchester Airport ] Manchester United ] M60 Manchester ] Greyhound Stadium /Retail Park Chester ] Hams Hall Power Station Birmingham ] National Exhibition Centre ] Old Liverpool Airport ] Ogsten Water Treatment Works ] Birches Head Combined Sewer/Storage Stoke-on-Trent ]

About the Company ] Contact Information ] Location ] Services ] Contracts ]

Send mail to Webmaster with questions or comments about this web site.
Copyright © 2000 McDermotts Construction / McFour Ltd
All rights reserved Delia McDermott
Last modified: June 09, 2005